CE2MCP: Management of Construction Projects 1

°ÄÃÅÁùºÏ²Ê¿ª½±¼Ç¼

CE2MCP: Management of Construction Projects 1

Module code: CE2MCP

Module provider: School of Construction Management and Engineering, School of Built Environment

Credits: 20

Level: Level 2 (Intermediate)

When you'll be taught: Semester 1

Module convenor: Dr Shabnam Kabiri, email: s.kabiri@reading.ac.uk

Pre-requisite module(s): This module is only available to students in the School of Built Environment. (Open)

Co-requisite module(s):

Pre-requisite or Co-requisite module(s):

Module(s) excluded:

Placement information: NA

Academic year: 2024/5

Available to visiting students: No

Talis reading list: Yes

Last updated: 12 September 2024

Overview

Module aims and purpose

This module is to study various aspects of the managing construction projects through learning and assessing existing management techniques with the focus on time, cost, quality, resources, risk, logistics and health and safety.  

The Module Lead at the °ÄÃÅÁùºÏ²Ê¿ª½±¼Ç¼ Malaysia is Dr Maizon Hashim (m.hashim@reading.edu.my).

Module learning outcomes

By the end of the module, it is expected that students will be able to: 

  1. Apply fundamental management techniques to monitor and control the time, cost and quality in construction projects   
  2. Provide critical assessment and application of the roles and responsibilities of construction managers in managing construction processes and the team dynamics  
  3. Conduct examination of the risk in construction projects and the development of risk management strategies  
  4. Analyse the principles of the management of health and safety in construction projects within the frameworks of relevant regulations and management systems.

Module content

  • General introduction – Leading concept of Work Break Down Structure (WBS)
  • Project time management
  • Project cost management
  • Project resource management
  • Quality control and assurance
  • Principles of schedule compression
  • Risk management
  • Project management and the team dynamics
  • The management of health & safety

Structure

Teaching and learning methods

The module is delivered via lectures and tutorials on relevant topics. 

For students studying at our campus in Malaysia: This module may be taught in a different semester and the breakdown of study hours may differ to those set out in the Study Hours table (please refer to the Module Handbook for the correct breakdown). In addition, you will be required to complete an additional 40 hours of study, taking the total number of study hours to 240 for this module. This is to comply with the Malaysian Quality Agency (MQA)

Study hours

At least 22 hours of scheduled teaching and learning activities will be delivered in person, with the remaining hours for scheduled and self-scheduled teaching and learning activities delivered either in person or online. You will receive further details about how these hours will be delivered before the start of the module.


 Scheduled teaching and learning activities  Semester 1  Semester 2 Ìý³§³Ü³¾³¾±ð°ù
Lectures 10
Seminars
Tutorials 6
Project Supervision 4
Demonstrations
Practical classes and workshops
Supervised time in studio / workshop
Scheduled revision sessions 2
Feedback meetings with staff
Fieldwork
External visits
Work-based learning


 Self-scheduled teaching and learning activities  Semester 1  Semester 2 Ìý³§³Ü³¾³¾±ð°ù
Directed viewing of video materials/screencasts
Participation in discussion boards/other discussions
Feedback meetings with staff
Other
Other (details)


 Placement and study abroad  Semester 1  Semester 2 Ìý³§³Ü³¾³¾±ð°ù
Placement
Study abroad

Please note that the hours listed above are for guidance purposes only.

 Independent study hours  Semester 1  Semester 2 Ìý³§³Ü³¾³¾±ð°ù
Independent study hours 178

Please note the independent study hours above are notional numbers of hours; each student will approach studying in different ways. We would advise you to reflect on your learning and the number of hours you are allocating to these tasks.

Semester 1 The hours in this column may include hours during the Christmas holiday period.

Semester 2 The hours in this column may include hours during the Easter holiday period.

Summer The hours in this column will take place during the summer holidays and may be at the start and/or end of the module.

Assessment

Requirements for a pass

Students need to achieve an overall module mark of 40% to pass this module.

Summative assessment

Type of assessment Detail of assessment % contribution towards module mark Size of assessment Submission date Additional information
Written coursework assignment Group-based written coursework 100 4,000 words

Penalties for late submission of summative assessment

The Support Centres will apply the following penalties for work submitted late:

Assessments with numerical marks

  • where the piece of work is submitted after the original deadline (or any formally agreed extension to the deadline): 10% of the total marks available for that piece of work will be deducted from the mark for each working day (or part thereof) following the deadline up to a total of three working days;
  • the mark awarded due to the imposition of the penalty shall not fall below the threshold pass mark, namely 40% in the case of modules at Levels 4-6 (i.e. undergraduate modules for Parts 1-3) and 50% in the case of Level 7 modules offered as part of an Integrated Masters or taught postgraduate degree programme;
  • where the piece of work is awarded a mark below the threshold pass mark prior to any penalty being imposed, and is submitted up to three working days after the original deadline (or any formally agreed extension to the deadline), no penalty shall be imposed;
  • where the piece of work is submitted more than three working days after the original deadline (or any formally agreed extension to the deadline): a mark of zero will be recorded.

Assessments marked Pass/Fail

  • where the piece of work is submitted within three working days of the deadline (or any formally agreed extension of the deadline): no penalty will be applied;
  • where the piece of work is submitted more than three working days after the original deadline (or any formally agreed extension of the deadline): a grade of Fail will be awarded.

The University policy statement on penalties for late submission can be found at: /cqsd/-/media/project/functions/cqsd/documents/qap/penaltiesforlatesubmission.pdf

You are strongly advised to ensure that coursework is submitted by the relevant deadline. You should note that it is advisable to submit work in an unfinished state rather than to fail to submit any work.

Formative assessment

Formative assessment is any task or activity which creates feedback (or feedforward) for you about your learning, but which does not contribute towards your overall module mark.

The students will receive formative feedback in the 6 hours of tutorials and 4 hours of project supervision sessions.  

Reassessment

Type of reassessment Detail of reassessment % contribution towards module mark Size of reassessment Submission date Additional information
Written coursework assignment Individual-based written coursework 100 4,000 words During the University resit period

Additional costs

Item Additional information Cost
Computers and devices with a particular specification
Required textbooks
Specialist equipment or materials
Specialist clothing, footwear, or headgear
Printing and binding
Travel, accommodation, and subsistence

THE INFORMATION CONTAINED IN THIS MODULE DESCRIPTION DOES NOT FORM ANY PART OF A STUDENT'S CONTRACT.

Things to do now